picture this, me

Transitioning a bit tonight. Seems lonelier, and I find myself wanting to be busy. Last time here it took me about 6 days to get over the "what the hell am I doing here" feelings. This time I prepared to let them come. It's necessary for me to let myself feel lonely in order to get quiet enough to begin to really feel.

 

weblog

 

 


above: Sunset - tried to sew several images together - but the light was changing.


Having bolted the pump, which has been rattling around
in my various buckets for 2 years, to the back of one of
the drawers from the entertainment center, I made the
first serious cut of the existing sewer hose.


Here the pump is running filling the blueboy on the bed of the truck. All went well, as I would stop pumping every 30 seconds to check the level of the contents and the weight.

Full blueboy headed for the blueboy dump 2 miles away

I took this picture on the way back from the blueboy dump. Butch liked this picture, as we couldn't figure out why anyone would put a sign - dusty road- in the middle of hundreds of miles of nothing but dusty roads.

Here's the blueboy dump. My hands were busy and not too clean, so I didn't get a picture of the dump itself. However not a drop was spilled and I was able to dump without every picking up the blueboy - which was the goal of this whole project, to save my back.

I drove over and got in line to use the RV dump - which has water for rinsing, but the line was 6 RV's waiting, and no signs of movement. I came back to this - the BLM calles it a dry dump - meaning there is a leach field under there, but no water to rinse.I was a bit nervous because it was a first dump for this system I had designed. I was dumping from the truck height through the remaining sewer hose down to the open holes visible in the picture. Worked like a charm, dripping nothing, and most important I didn't drip anything in the back of the truck.

A successful project.


Link to ALL WEBLOGS

 

Agree, disagree, want to comment? Email me!
© 2003-2007 another casa la blanca production